| 0.2 |0.5 |
| | 0.1|0.2 | |
| 0.6|0.4 | 0.3|0.3 |
| | 4 | | |
| 0.5| 0.4 |0.1| | 0.1 0.5 |
+ 2--+---+-----------+---+ +-------+---+--6 |
| 0.7| 0.2 0.5| | 0.2 |0.7 |
| | | | | |
| 1.0|0.4 0.3|0.1 0.2|0.2 0.4|0.5 |
| | 3 | | | |
| 1.9| 1.8 |1.9| 1.8 | 1.8 |1.6 |
+ 8----+-----------+---+-------+-------+----7 |
| 1.6 2.1 2.1 2.3 2.2 1.9 |
| |
+-------+-------+-------+-------+-------+-------+-------+-------+
Figure 4. 2004 Miasma Beach PM-peak Observed Volumes (hourly)
[Page]
5.4 Prepare Task 5 Documentation
Prepare Task 5 documentation, including all transcad maps and dataviews. Follow all Project Report Style Guidelines in the preparation of this documentation. This material will be submitted as part of the second Interim Report (see Task 5.5).
5.5 Model Validation Interim Report
Submit a Project Interim Report containing reports for Tasks 3 - 5 as well as model validation results. Clearly identify any current network supply deficiencies. This information should be presented in graphical, tabular, and text format. The network deficiencies that you identify define any current problems tha
上一页 [1] [2] [3] [4] [5] 下一页
特别声明:本站除部分特别声明禁止转载的专稿外的其他文章可以自由转载,但请务必注明出处和原始作者。文章版权归文章原始作者所有。对于被本站转载文章的个人和网站,我们表示深深的谢意。如果本站转载的文章有版权问题请联系编辑人员,我们尽快予以更正。本站所有技术文章、专业软件资料仅供技术人员、高校师生学习交流之用,目的旨在促进与提高中国的交通技术水平;用户获取后不得用于商业目的,否则,所产生的法律责任本站概不负责。