the equilibrium assignment (7) separates in a (linear) travel time part
T and a (non-linear) congestion part
The derivative of the objective function with respect to
(12), used to compute the optimal step length
, is
With the above preliminaries, we can now outline the implementation of the EMME/2 equilibrium transit assignment macro CONGTRAS (CONGested TRansit ASsignment):
Step:
Description:
Module:
1
Initialize congestion costs US1 to 0.
2.41
2
Compute total number of transit trips and initialize iteration counter
.
3.21
3
Perform uncongested fixed cost assignment to obtain
and
.
5.11/5.31
4
Compute congestion cost .
2.41
5
Increment iteration counter
.
3.21
6
Compute new segment congestion costs 